You cannot afford to find the coordination errors on-site.

In a data center project, a missed clash between the structural element and the  HVAC duct does not show up as a drawing problem. It shows up as a construction hold, a client call, and a schedule that no longer works. 
The firms that consistently deliver this work on time are not luckier than the ones that do not. They have a partner who perform thorough clash detection before they reach the site. 

 
Intrivis brings expertise of architectural, structural and MEP traits experience directly into the data center vertical. Our teams do not arrive at a data center project learning what precision cooling is. They arrive knowing how it coordinates with the electrical  lines, the structural floor loading, the fire suppression, and the architectural security zones, and how those systems conflict when the coordination is not managed from the start. We work as a single-source partner across every discipline your data center project requires.

One point of contact. One coordinated model. One set of deliverables, without your team having to reconcile three separate outputs from three separate vendors. 
Whether you are a developer entering the data center market for the first time, or a firm managing a live pipeline of mission-critical projects, we build your schedule, not ours. 

Everything your data center project needs. From a team that already knows it. 

Civil & Site Design Support

Site design for a data center campus is where the project timeline is won or lost before the first structural element goes in the ground. We handle site grading and drainage, utility stub-outs and coordination, paved access roads, generator fuel farm layouts, and stormwater management plans, meeting local and federal requirements for both greenfield and brownfield sites. 

  • Site grading and drainage 
  • Utility stub-out coordination 
  • Paved access road design support
  • Generator fuel farm layouts 
  • Stormwater management plans 
  • Greenfield and brownfield site development

Architectural Design Support & BIM

Architecture in a data center is not decoration, it is access control, operational flow, and construction sequencing built into the model from the start. We provide design support for multi-zone security perimeters, modular white-space layouts, loading dock and generator pad integration, and full architectural BIM packages that are ADA compliant, fully coordinated, and formatted for Authority Having Jurisdiction submission. 

  • Multi-zone security perimeter planning 
  • Modular white-space layouts 
  • Loading dock and generator pad integration 
  • Permit-ready architectural BIM packages 
  • ADA compliance 
  • 3D renderings

Structural Design Support & BIM

Data centers infrastructure demands a solid n structural integrity that most commercial buildings do not, raised access floors, high-density rack loads of up to 30kN per square meter and beyond, seismic bracing for sensitive network equipment, and mezzanine plant rooms built around operational access. Our teams do not learn these requirements on your project. They bring them to it. 

  • Raised access floor systems 
  • High-density rack load calculations 
  • Seismic bracing for network equipment 
  • Mezzanine plant room framing 
  • Fully coordinated Revit BIM models 

Precision Cooling & HVAC Design Support

Cooling is the largest operating cost in a data center, and the design decisions made here are not recoverable once construction starts. We provide design support for CRAC and CRAH unit placement, in-row cooling, liquid cooling integration, free-cooling economizer layouts, and chilled water plant systems, every layout optimized for Power Usage Effectiveness and thermal containment, to the guidelines. 

  • CRAC and CRAH unit placement and sizing 
  • In-row and rear-door cooling 
  • Liquid cooling integration 
  • Free-cooling and economizer design 
  • Chilled water plant layouts 
  • Hot aisle / cold aisle containment 
  • PUE optimization

Electrical & Power Distribution Drafting 

We produce the full electrical package, coordinated with the structural and mechanical from the start, not issued separately. Single-line diagrams, panel schedules, cable tray routing, earthing and bonding layouts, and switchgear room drawings, all designed for the dual-path power architectures and N+1 or 2N redundancy that mission-critical facilities demand, compliant with regulations. 

  • Single-line diagrams 
  • Panel schedules 
  • Cable tray routing 
  • Earthing and bonding layouts 
  • Switchgear room drawings 
  • Dual-path power architecture 
  • N+1 and 2N redundancy design support

Every type of data center. Every scale of project.

  • Hyperscale Data Centers: 100,000+ square foot campuses for cloud providers and large enterprises. High-density power distribution, large-scale cooling plant design support, and campus-level civil coordination.
  • Colocation Facilities: Multi-tenant facilities with shared infrastructure, flexible cage and rack deployments, and the architectural security zoning that colocation clients require. 
  • Edge Data Centers: Small-footprint, distributed facilities built for low latency. Compact MEP coordination, prefabricated structure options, and rapid design support turnaround.
  • Enterprise On-Premise: Private data halls and computer rooms within corporate campuses designed around your operational requirements and integrated with the wider building systems.
  • AI and High-Performance Computing Facilities: GPU-dense clusters requiring very high rack power densities, liquid cooling integration, and reinforced structural floors. We understand what changes at this scale and why.
  • Modular and Prefabricated Data Centers: Containerised and skid-mounted solutions where coordination between structure, MEP, and architecture must be resolved before fabrication. We deliver that coordination.

What working with us actually looks like.

1

One point of contact who owns everything 

Every project has a named point of contact from day one. Not a rotating contact, not a ticket queue one person who attends your calls, tracks your milestones, and surfaces issues before they reach you as problems. You stay in control of a live deadline without personally chasing every thread. 

2

48-hour Level of Effort on defined scope 

We return a detailed Level of Effort within 48 hours of receiving your scope. No waiting. No vague ballparks. Your project schedule does not pause while we write a proposal. That commitment is in writing. 

3

Drawings that pass QA before they reach you 

Automated clash detection. AI-assisted review. A documented sign-off before any deliverable leaves our desk. A drawing set that needs a second review cycle costs you time you do not have. We build the process around that. 

4

The cost structure of a delivery partner, not a permanent hire

Onshore leadership. Offshore execution. US-standards quality at a fraction of the cost of permanent headcount with no bench to carry when the project ends and no ramp-up time when the next one starts. Scale the resource to the pipeline. 

5

Flexible to your pipeline, not ours

Hourly, project-based, or retainer. Scale up when the pipeline grows. Scale down when it does not. We absorb the variability of a live project environment so you do not have to. 

6

100% compliant with US standards

Every deliverable is reviewed against applicable standards before it leaves our team. We do not describe our compliance, we produce the evidence of it. 

Frequently Asked Questions

FAQ'S

Hyperscale campuses, colocation facilities, edge nodes, enterprise on-premise data halls, and AI and GPU-dense builds requiring liquid cooling and high-density power distribution. Greenfield and brownfield. New build and retrofit. Tier I through Tier IV.

  • ANSI/TIA-942 for data center infrastructure. 
  • ASHRAE TC 9.9 for thermal guidelines.  
  • NFPA 70/NEC for electrical.  
  • IBC and ASCE 7 for structural loading.  
  • ISO 9001 for quality management.  

Every deliverable is reviewed against applicable standards before it leaves our team.

We use Navisworks for automated clash detection across all federated BIM models. Clashes are identified and resolved during the design phase, before constructionreducing RFIs and change orders on site. Every coordination session is documented. Clash detection after the fact is damage control.

48 hours from receipt of a defined scope. That is a documented commitment, not a target. Your project schedule does not wait on our proposal process.

Yes. Very high rack power densities — 30 to 100+ kW per rack — require different structural floor specifications, a different cooling approach, and a different power distribution architecture. We understand what changes at this scale and why.

Hourly, project-based, and retainer. All three include a dedicated point of contact and access to the full Intrivis delivery team. No tier system. No premium for responsiveness.

Data center developers, general contractors managing mission-critical builds, and architecture and design firms who need a coordinated delivery partner for structural, MEP, or civil scope. We work with firms of all sizes — from small practices managing their first data center project to large firms with an ongoing pipeline. 

Yes. Our hybrid delivery model means we can bring additional resource onto a project without client-side overhead. We scale to your pipeline — you do not scale your team to manage us.

Your next data center project starts with the right decision.

The project manager who delivers this project on schedule gets handed the next one. The firm that builds its data center capability now positions itself ahead of a market that is not slowing down. 
Book a 30-minute consultation. We will review your scope, answer the questions your approver will raise, and return a full Level of Effort within 48 hours. No obligation. 