30May
How Outsourcing As-Built Plans Can Save Time in Close-Out Phases
In the fast-paced world of construction and renovation, time is money—especially during the close-out phase. This final stage of a project, where documentation is finalized, inspections are completed, and deliverables are handed over, can often drag on longer than expected. One of the most time-consuming tasks during this phase is the preparation of as-built plans.
Studies indicate that 52% of construction rework stems from miscommunication and inaccurate documentation, including as-built plans. This rework contributes to the industry's estimated $177 billion annual loss globally due to poor documentation practices.
However, outsourcing this task to a qualified third party can significantly streamline the process, reduce delays, and improve accuracy. In this blog, we will explore why outsourcing As-Built plans can save time in close-out phases.
What Are As-Built Plans?
As-built plans are updated architectural drawings that reflect all the changes made during the construction process compared to the original design. These documents are critical for:- Final inspections and approvals
- Facility management and maintenance
- Renovations or future modifications
- Legal and contractual compliance
The Time Pressures of the Close-Out Phase
The close-out phase is when pressure mounts to finalize documents, settle accounts, and deliver a complete, functioning project to the client. Any delays in producing as-built drawings can result in the following:- Delays in project completion
- Disruption to facility operations
- Withholding of final payments and retention
- Complications in warranty and claims management
- Increased risk of documentation error